The railway after pegging out but before ballasting.
3 shots with the first panel ballasted and the second panel levelled off. The railway's the first element of the garden to go in as the rest of the garden will take its shape from it. It'll probably be next year before the vegetables go in now!
Second job will be the brick wall to go in just behind the tipper truck.
No comments:
Post a Comment